| 01 |
Supplying light vehicle (LV) services to Paragon Tailings Tanzania (North Mara). (November
2021 to date) |
On going |
| 02 |
General supply in safety wear and equipment at Buckreef Gold Mine Limited – Katoro,
Geita (June 2021 to date) |
On going |
| 03 |
General supply in safety wear and equipment to Paragon Tailings Tanzania (April 2022 to
date) |
On going |
| 04 |
Successful commissioning of 250tpd plant at NGM Gold Mine Bukombe (Geita) (Sept 2018 to
July 2019) |
Completed |
| 05 |
Successful commissioning of 240tpd plant at AURA Gold Mine, Geita (Dec 2017 to June 2018)
|
Completed |
| 06 |
Successfully designed & commissioned a 150tpd Hydro-sluicing plant at Tembo Mining –
Katoro (April 2018 to Dec 2018) |
Completed |
| 07 |
Upgrading and re-commissioning of the gravity circuit. Optimization of the Krebs gmax 500
gravity cyclones and two KC-XD48 concentrators. New scalping screens were installed and the
acacia leach time optimized. Circuit availability, utilization and gold recovery were
improved. MMG Gold Mine – Musoma (Sept 2018 – Dec 2018) |
Completed |
| 08 |
Cyanide dosage optimization: the split leach method was used, proving high gold recovery
and reduced tails cyanide (less than 100 ppm). CATA Mining – Musoma (Feb 2018 –
April 2018) |
Completed |
| 09 |
Optimization of the caustic concentration to improve Electrowinning cell performance. NGM
Gold Mine – Bukombe (Geita) (Sept 2018 to July 2019) |
Completed |
| 10 |
Scoping and supervision of ore characterization and other metallurgical test works,
circuit surveys, interpretation of results, reporting and subsequent plant optimization. NGM
Gold Mine – Bukombe (Geita) (Sept 2018 to July 2019) |
Completed |
| 11 |
Gold production optimization at OTTA Gold Mine – Chunya, Mbeya (Nov 2019 – Feb
2020) |
Completed |